CRPOWER STATION

urban power station

Currently under design, this urban Power Station is being planned in two construction phases over 10 years, with a planned output of 500MW. Because of the Power Station's location within an urban center, the client brief asks BAM to "integrate the utilitarian infrastructure of the power plant into the visual, programmatic, and ecological fabric of [the city]." BAM shows here three conceptual options presented to the clients in the initial phase of the project.